Short answer: You can sell a Los Angeles apartment building with an unpermitted unit, but buyers will compare your rent roll to the permit record and ask how the extra unit will be handled. Before you list, find out which path fits: state ADU law (Government Code Section 66311.7, formerly 66332) generally bars the city from denying a permit for an unpermitted ADU built before January 1, 2020 just because it breaks building or ADU rules, unless a fix is needed to correct substandard conditions; the City's Unpermitted Dwelling Unit (UDU) ordinance can legalize older units in exchange for a recorded affordable unit; and removing a unit usually means relocation payments to the tenant.
Updated: November 2026. We'll refresh this post if state ADU law or the City's rules change.
Here's how unpermitted units come up in a sale, the options, and a hypothetical example.
What counts as an unpermitted unit?
It's a dwelling unit that people live in but that isn't on the building's permit record or certificate of occupancy. Common examples in Los Angeles are a converted garage, a unit split off a larger apartment, a ground-floor storage or recreation room turned into an apartment, or a guest room with a kitchen added. City Planning's own background on the UDU ordinance says most of the units being removed under code enforcement were removed because of zoning violations that couldn't easily be fixed under the old rules.
How do buyers find unpermitted units?
Usually by comparing three things: the unit count on your rent roll and in the listing, the legal unit count in the City's permit and certificate of occupancy records, and the zoning shown on the City's ZIMAS map. Code enforcement can also surface a unit; City Planning noted when it adopted the UDU ordinance that 400 to 500 units a year were being removed as an unintended result of the Systematic Code Enforcement Program's periodic inspections of multifamily buildings.
It's better if the buyer hears it from you first. A surprise in escrow tends to reopen price; a known issue with a plan attached is easier to underwrite. Ask a real estate attorney what you must disclose for your building.
Can an unpermitted unit be legalized as an ADU?
Often, under state law. Government Code Section 66311.7 says a local agency shall not deny a permit for an unpermitted accessory dwelling unit or junior ADU built before January 1, 2020 because it violates building standards or doesn't meet state or local ADU rules. The agency can deny it only if it finds a correction is needed to meet the substandard-housing standards in Health and Safety Code Section 17920.3, and the protection doesn't apply to a building deemed substandard. AB 2533 moved the cutoff to January 1, 2020 starting in 2025, and SB 543 renumbered the section from 66332 to 66311.7 effective January 1, 2026, without changing that rule.
The law also says the owner generally shouldn't be charged impact fees or connection or capacity charges, with limited exceptions, and that if an inspector finds health and safety problems, the agency can't penalize the owner for having the unit and must approve the permits needed to fix them.
In an August 14, 2025 letter to the City of Los Angeles, the state housing department (HCD) said this section (then numbered 66332) has no upper limit on the number of units and requires approval of "any and all unpermitted ADUs" built before 2020 if they are habitable and meet the ADU definition, including units in an existing multifamily building. Your architect or permit expediter can tell you whether your unit qualifies. See also our post on ADUs and LA property value.
What is the City of LA's UDU ordinance?
The Unpermitted Dwelling Unit ordinance (Ordinance No. 184,907, in effect since May 17, 2017) is a voluntary City program for legalizing qualifying unpermitted units. The building must be in a zone that allows multifamily use (R2 or less restrictive), and the unit must have been occupied as a residence at some point between December 11, 2010 and December 10, 2015, shown with evidence such as a lease, a utility bill, an RSO rent registration certificate or code enforcement records.
The trade-off is affordability. City Planning says the owner must provide at least one low- or moderate-income affordable unit for each unit legalized, and the ordinance requires a recorded covenant keeping each restricted unit affordable for at least 55 years. The process runs through City Planning, the Department of Building and Safety (LADBS) and LAHD in six steps, ending with a new certificate of occupancy. LAHD charges a fee to prepare the covenant; ask the City for the current amount.
What if I remove the unit instead?
If the City orders the unit vacated, that is a no-fault reason to end the tenancy under LA's Rent Stabilization Ordinance and Just Cause Ordinance. LAHD requires the owner to file a Declaration of Intent to Evict with a copy of the government order before serving notice, and to pay relocation assistance, usually within 15 days of the notice. LAHD's 2026-27 relocation chart runs from $11,000 to $27,400 per unit depending on the tenant and length of tenancy. A voluntary buyout is another route; see cash for keys vs the Ellis Act.
Removing the unit also removes its rent, which lowers the income a buyer pays for. Price that against the cost and delay of legalizing it.
How does an unpermitted unit change the price?
Buyers will want to know which path the unit is on and what it would take to finish it. A unit that clearly qualifies under Section 66311.7 is a different risk than one that would need a UDU affordability covenant or would have to be removed. Rent control also matters. LAHD lists ADUs among the unit types the RSO generally covers in buildings built on or before October 1, 1978. See how RSO buildings are priced and how comps work.
What could this look like on one building?
This is a hypothetical example, not a real property or one of our sales. An owner has an R3-zoned eight-unit building in North Hollywood built in 1962 and permitted for eight units. In 2012 a prior owner turned two garage spaces into a ninth unit, which has been rented since.
| Path | Does the hypothetical unit qualify? | What the seller should weigh |
|---|---|---|
| State ADU law (Gov. Code 66311.7) | Likely worth checking: built before Jan 1, 2020 | Health and safety fixes; architect and permit time |
| City UDU ordinance | Likely meets the occupancy test (rented since 2012) | One affordable unit per legalized unit, 55-year covenant |
| Remove the unit | Requires a no-fault path and LAHD filings | Relocation of $11,000 to $27,400 (2026-27); lost rent |
| Sell as-is, disclosed | Any unit | Buyer reviews the disclosure and permit record |
Hypothetical example only. Whether a real unit qualifies depends on the City's review.
What should I gather before I list?
Pull the permit history and certificate of occupancy, a ZIMAS zoning printout, your LAHD rent registration, current leases and any orders or notices from LADBS or LAHD. Section 66311.7 notes that an owner can get a confidential third-party code inspection from a licensed contractor before applying for a permit, which is a sensible first step. With that in hand we can price the building both ways and decide whether to legalize before the sale or market it with a plan. See how long a sale takes.
Selling an LA building with an extra unit?
Call David Saghian at (310) 401-1559 or request a free property valuation. We'll show you how buyers are likely to view the unit and what each path could mean for your price. We don't give legal advice; for permits and disclosures, work with an architect or permit expediter and a real estate attorney. DRE 01992252.
This article is general information, not legal advice. Permit, zoning, rent control and disclosure rules depend on your building and change often. Talk to a real estate attorney before you list, serve any notice or sign a disclosure. The example is hypothetical and doesn't describe a real property or client.